Canandaigua Lake Permitting Process

“Under ARTICLE 15, ENVIRONMENTAL CONSERVATION LAW IMPLEMENTED BY 6NYCRR PART 608, regulations govern the “use and Protection of Waters, “ essentially requiring permits for any activity that could disturb or alter the state’s water bodies”

Typically project in the Finger Lakes require permitting. The permitting process can be different per project, lake, and town. Various agencies issue permits such as the NYS Department of Environmental Conservation (DEC), U.S. Army Corps. of Engineers, the New York Office of General Services, NYS Department of State and local town Code Enforcement.

Lake, and project depending, a Joint Application and documentation may be required to be submitted to these agencies. Each governmental agency has their own regulations that must be met for them to determine whether a permit for construction is necessary and/or if it will be issued by their agency.

Canandaigua Lake - Docks & Custom Boat Lifts & Hoists

Canandaigua Lake is governed by the Uniform Docks and Mooring Law, which requires a different permitting approach than navigable waterways. For projects on Canandaigua Lake, applications and all required documentation must be filed with the town Code Enforcement Officer. Depending on your project's scope, a meeting with the town board may be necessary. A real property survey depicting the mean-high water line, water rights lines and the ten foot set back is a standard requirement along with drawings and other documentation.

Canandaigua Lake extends from the Town of Canandaigua at its northern tip to Naples at its southern end. The lake has varying depths, with the southern end featuring approximately 60 feet to bedrock. Canandaigua Lake also has unique freezing patterns—the northern and southern ends typically freeze during winter while the middle section may remain open, which impacts dock design and seasonal maintenance requirements.

These distinct characteristics of Canandaigua Lake influence dock and boat lift installations. Our team at Brawdy Marine has specialized knowledge of Canandaigua Lake's conditions and regulations, handling all permit applications and required documentation to ensure your dock or custom boat lift project complies with the Uniform Docks and Mooring Law while maximizing functionality for your specific location on the lake.

Canandaigua Lake - Seawall Construction and Repair

For seawall construction and repair on Canandaigua Lake, all work beyond the mean high-water mark requires complete Joint Application documentation. Additionally, the town where your project is located may require a construction permit. Brawdy Marine will complete permit application packages to move forward with securing the requisite permits from all applicable agencies.

Canandaigua Lake's varied freezing patterns—with the northern and southern ends typically freezing while the middle may remain open—create unique challenges for seawall design and construction.

Our team at Brawdy Marine specializes in Canandaigua Lake seawall construction and repair, managing the entire permitting process while designing seawall solutions that address all unique conditions. We handle all applications for additional structures like retaining walls, decks not over water, and stairs that require local town permits as part of our comprehensive service.

What Services Can We Help You With?

-Quality Marine Construction
- Docks & Decks
- Patios
- Custom Docks & Decks Construction
- Retaining Walls and Seawalls Installers
- Seawalls : Construction and Repair Contractors
- Quality Custom Boat Hoist Lifts : Covered & Uncovered
- Hoists for Boats and Jet Skis
- Boat Lifts
- Pile Driving
- Barge Services & Crane Barge Services
- Excavation & Spoils Removal
- Servicing Commercial & Residential



Write Us a Review on Google!

Brawdy Marine Construction, Inc.

We work and live in the Finger Lakes Region 
1801 Kings Hill Road, Penn Yan, NY 14527

Phone:
(315) 536-0546

Mailing Address: 
P.O. Box 73, West Falls, NY 14170

Office Contact:
(716) 912-2246

Copyright 2023 Brawdy Marine Construction | Powered by W Marketing Group